Overlay Work on Dogwood South Lane Scheduled for Next Week
Posted: Apr 10, 2026, 2:30 PM
Drivers in the Dogwood South Subdivision should be prepared for some temporary inconvenience as road work gets underway on Dogwood South Lane.
Starting Tuesday morning, April 14, crews will begin repairing the base of the roadway between Silver Fox and Red Fox Circles, which will lead to delays during the work.
Only one lane will be closed at a time to keep traffic moving, but motorists are encouraged to slow down, pay attention to posted signs, and follow the directions of flagmen while passing through the area.
The work is part of Bossier Parish’s ongoing effort to improve local roads through its Overlay Program, which maintains hundreds of miles of paved roadways and dozens of bridges across the parish.